Renovation Update, part 13

Hello!

At this point we really are reaching the final stages of the painting phase! This week was focused on details: adding final additions, touching up where needed, and preparing to wrap things up.

The chair rail, which wraps around the church a few feet above the floor, was painted and stenciled this week. This finished off the lower part of the wall, with the colors giving a beautiful visual foundation.

The ceiling of the main vault also received some final details. On the lighting front, the lights strips are now installed, the trim pieces have been added to the main recessed lighting, and some spot lighting has been added for the sanctuary! All of the new lights are LEDs, which provide much greater efficiency and control compared to the old lighting.

Finally, the panels to the left and right of the sanctuary were finished this week, and look excellent!

The next few weeks will bring a reduced amount of visual updates as the painting is finished and the scaffolding is removed at the end of the month. However, once the scaffolding is down we’ll finally be able to see the church as a whole! After that comes flooring in preparation for the new furniture.

Things are really moving along!

Peace,

Fr. Brandon