Well, this marks the twentieth update post I’ve made as we’ve been moving through this renovation. Over those twenty weeks renovation has to some degree become the norm here at All Saints. It’s hard to believe that we’re approaching the end; I look forward to getting back to normal parish life!

Work on the confessional/closet continued, with the doors installed and stain applied. This stain gives a good sense of the darker finish of the new pews. The dark wood will contrast beautifully with the warm, lighter paint work.

The new music library was framed out, wired for outlets and lighting, and insulated this week. This room is on the right side of the choir loft, looking up from the nave, in the east tower. Previously unused space, this room will provide space for storing and preparing music for the choir.

The rear wall of the church was finally ready for paint this week. It’s not quite complete yet, but the paint really ties the space together. Those new windows look like they’ve always been there!

Finally, flooring installation continued with tile being laid in the church and carpet installed in different hallways. The main aisle is nearly complete, and looks stunning! Flooring will be the main focus at this point in preparation for furniture installation in mid January.